×
近期发现有不法分子冒充我刊与作者联系,借此进行欺诈等不法行为,请广大作者加以鉴别,如遇诈骗行为,请第一时间与我刊编辑部联系确认(《中国物理C》(英文)编辑部电话:010-88235947,010-88236950),并作报警处理。
本刊再次郑重声明:
(1)本刊官方网址为cpc.ihep.ac.cn和https://iopscience.iop.org/journal/1674-1137
(2)本刊采编系统作者中心是投稿的唯一路径,该系统为ScholarOne远程稿件采编系统,仅在本刊投稿网网址(https://mc03.manuscriptcentral.com/cpc)设有登录入口。本刊不接受其他方式的投稿,如打印稿投稿、E-mail信箱投稿等,若以此种方式接收投稿均为假冒。
(3)所有投稿均需经过严格的同行评议、编辑加工后方可发表,本刊不存在所谓的“编辑部内部征稿”。如果有人以“编辑部内部人员”名义帮助作者发稿,并收取发表费用,均为假冒。
                  
《中国物理C》(英文)编辑部
2024年10月30日

Status of the 2Q-LEBT Facility at ANL

  • The concept for a 2 charge state injector for a "RIA type" accelerator has been presented. Progress toward an operational prototype 2Q-LEBT system at Argonne National Laboratory (ANL) is under way. The existing BIE 100 all permanent magnet ECR has been placed on a high voltage platform capable of a combined >100kV with q/m separation at ground level. Remote control of the devices on the platform has been implemented. Other components of the facility are currently being tested. The components of an achromatic bending system are currently being procured. This paper will present recent work at the facility as well as preliminary development of solid materials using the BIE 100.
  • 加载中
  • [1] . Ostroumov P N et al. Proc. of the XX Linac Conf., Monterey, CA§Aug. 21-25, 2000. 2022. Leitner D et al. Rev. Sci. Inst., 2006, 77: 03A3023. Nolen J A. Nuclear Physics, 2004, A734: 6614. Ostroumov P N. Proc. of the PAC-2003, Portland, Oregon.4005. XIE D Z. Rev. Sci. Inst., 2002, 73(2): 5316. Vinogradov N E et al. Proc. of the 16th International Workshop on ECR Ion Sources, ECRIS04, Berkeley, CA, Sep.26-30, 2004. 2157. National Electrostatics Corp. www.pelletron.com8. Kolomiets A A et al. Proc. of the PAC-2003, Portland,Oregon. 28759. Vinogradov N E et al. Two-Charge-State Injector for a High Power Heavy-Ion Linac. Paper Submitted to LINAC-2006,Knoxville TN, August 200610. Power Heavy-Ion Linac. Paper Submitted to LINAC-2006,Knoxville TN, August 200611. Harkewicz R, Pardo R C et al. Rev. Sci. Inst., 1995, 66:288312. Omega Engineering, Inc., www.omega.com
  • 加载中

Get Citation
R.H.Scott1, V.N.Asseev1, T.V.Kulevoy2, P.N.Ostroumov1, E.A.Poklonskaya3,
M.Sengupta1 and N.E.Vinogradov4. Status of the 2Q-LEBT Facility at ANL[J]. Chinese Physics C, 2007, 31(S1): 111-114.
R.H.Scott1, V.N.Asseev1, T.V.Kulevoy2, P.N.Ostroumov1, E.A.Poklonskaya3,
M.Sengupta1 and N.E.Vinogradov4. Status of the 2Q-LEBT Facility at ANL[J]. Chinese Physics C, 2007, 31(S1): 111-114. shu
Milestone
Received: 2007-05-30
Revised: 1900-01-01
Article Metric

Article Views(3234)
PDF Downloads(730)
Cited by(0)
Policy on re-use
To reuse of subscription content published by CPC, the users need to request permission from CPC, unless the content was published under an Open Access license which automatically permits that type of reuse.
通讯作者: 陈斌, [email protected]
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Email This Article

Title:
Email:

Status of the 2Q-LEBT Facility at ANL

  • Physics Division, Argonne National Laboratory, Argonne, IL 60439, USA2 ITEP, Moscow, 117259, Russia3 St. Petersburg Electrotechnical University, St. Petersburg, 197376, Russia4 Northern Illinois University, De Kalb, IL 60115, USA

Abstract: The concept for a 2 charge state injector for a "RIA type" accelerator has been presented. Progress toward an operational prototype 2Q-LEBT system at Argonne National Laboratory (ANL) is under way. The existing BIE 100 all permanent magnet ECR has been placed on a high voltage platform capable of a combined >100kV with q/m separation at ground level. Remote control of the devices on the platform has been implemented. Other components of the facility are currently being tested. The components of an achromatic bending system are currently being procured. This paper will present recent work at the facility as well as preliminary development of solid materials using the BIE 100.

    HTML

Reference (1)

目录

/

DownLoad:  Full-Size Img  PowerPoint
Return
Return